Since I last posted, we purchased the kitchen cabinets and gas stove from Ikea (to be delivered November 20), rented the largest container (dumpster) possible, demolished the dining room, most of our bedroom and the big kitchen cabinet (that housed the washer/dryer), removed all the kitchen cabinets, filled a container with all the crap, had it removed and ordered another one, and last but not least, we moved out of the house. The original plan A had been to move into Marc's parents caravan. His dad drove it here and while it would have just fit into the back garden, it would have taken at least half an hour to move it in and out. This just wasn't an option given we were going to need to move it every other day while the basement work is still very active. So, plan B, we considered a hotel, which is still an option, but we need to save every penny we can, which led to plan C, the "Lenny" option. The first couple of nights were spent in my beloved campervan which had served me well on my 3-week trip across Canada last year. It's small but perfectly formed, and since we've not demolished the bathroom in the house, works OK for us. However, we now have a plan D due to the generosity of our neighbour, who offered to put us up this week. THANK YOU, Gilbert!

Now we just have to figure out how to get things to the point in the house that we can move back in... But at least once all the basement work wraps up at the end of this week (REALLY, Joanna?! Are you pulling my leg?!) we then go back to plan A (the luxury caravan). Marc and I have been talking about what's the absolute minimum we have to have done before living in our home is a real option. It involves completing the demolition, then insulating and dry-walling the bedroom. Given our current rate of progress, and all the help from Marc's dad (and not forgetting his son too!) we think 2 weeks, yes, just two weeks, is enough to make this a reality. However if plan A works for us, it takes the pressure off, and allows us to focus on the real goal of being ready for Christmas.

That's just the things we've been working on. On the contractor side, the mason work has finally started! Our house is ready for halloween as it's been covered by mesh and scaffolding. In the basement, the back wall for the house has been framed, the courtyard stairs have been made ready for the concrete, and the concrete will be poured for them AND THE BASEMENT FLOOR... TOMORROW :) I think it really is going to happen. At last!

One other piece which happened at the last minute, today to be precise, is that we had Delta Membrane put up all around the walls of the basement. Marc had thought we may need this since the beginning, and long and the short of it, it got put up today. So all good.

I'll let you know if we really did get a basement floor... tomorrow...